Meeting #9 minutes: April 1

Franklin Street Arterial Study CommitteeMeeting #9 , April 1st, 2009NotesCom. Members present: Alex Landry, Greg Martin, Liz Hoglund, Jaime Parker, Boyd Marley, Markos Miller, Katie Brown, Ethan Boxer-Macomber, Mark Adelson, Cathi Debo, Mike LabergeStaff: Mike Bobinsky, Kathy Earley, Alex Jaegerman, Carl Eppich, Greg Mitchell, Gerald VarneyConsultant: Mitch Rasor

  1. Welcome and Introductions
  2. Update on Public Workshop, April 29th, Ocean GatewayFollow Up committee meeting on April 30th, 6-8 pm, Ocean Gateway
    • Details and format will be discussed at April 15 meeting.
  3. Final Review of Performance Criteria
    • Minor additions to Performance Criteria made: ‘amenities’ added as sidewalk quality; ‘for all users’ added to width of travel lanes under Urban context; ‘Appropriate mix of land-use types’ added to Land Use
    • Performance Criteria approved by all members present
  4. Follow Up on Peninsula Traffic Data- Mike Laberge
    • MIke Laberge presents comparative volumes and crash data between State/High and Franklin. See attached AADTCRASHMAPNOTES. Summary: S/H has 10% more volume, 50% more vehicular or pedestrian accidents.
  5. Exit 7 Project and Process
    • Ernie Martin from MDOT gave a presentation on Exit 7 project to address traffic backing up onto I-295.
    • Northbound off ramp to become two lanes, ending at traffic signal/intersection with end of SB ramp.
    • Southbound ramp to be extended from Washington Ave on ramp, widened to two to three lanes, coming to a signal at intersection with NB ramp.
    • A separate “Intersection” project will address intersection of Marginal/Franklin through to Fox/Somerset, including crosswalks, etc (Will be based on Franklin study-We are stakeholder group for Intersection project).
    • Questions/Comments of committee include:
      • Being sure crosswalks and necessary sidewalks are included
      • City to include sidewalks
      • Why not roundabouts at this location-Review Roundabout Guidelines-”may be better @Fox/Somerset” EM
      • Want to see data supporting dimensions of new SB lane
      • Need to phase signals with Franklin lights
      • Community desire for Pedestrian Trail connection to Back Cove Trail at Exit 7- want to see designs that would be compatible
      • Off ramp signals appear to create safer environment for Pedestrians
      • Is there a Pedestrian refuge island?
      • Construction will impact Exits 3 and 4.
      • Public Meeting anticipated for June.
      • Other projects (Veteran’s Bridge, 295 Exits) may push Exit 7 schedule back
      • Franklin Committee to play a ‘check in’ role
        • Check the I-295 Corridor study website, as it reflects data.
        • Committee discusses option to take a position in favor of Trail Connection
        • Concerns about Committee getting bogged down in Exit 7 discussion
        • Can look at data and compare with other exits, other communities
        • May want a 3rd party review
        • Committee to revisit Exit 7
  6. Updates
    • PHA/EBNO Workshop. April 21st, 7-8:30, 47 Smith Street.
    • Roundabout Field Trip planned to Augusta and Auburn for April 2nd.
    • Walking Tour of Franklin planned for May 5th meeting
  7. Comments
    • Request a scaled section of Exit 7 plans
  8. Next Mtg:Workshop PrepApril 15 Design ExerciseDiscussion Points